Ballston Lake Sewer Committee
Meetings
- Monthly
- Ballston Town Hall
Meeting Room
323 Charlton Road
Ballston Spa, NY 12020
View the Town Calendar for more information.
Meeting Minutes
Click the link below to view meeting minutes.
View Most Recent Agendas and Minutes
Members
- Eric Connolly, Town Board Liaison
- Kelly Jasinski, Town Board Liaison
- Drew Hamelink, Chairperson
- Wes DeVoe, Committee Member
- Jim DiPasquale, Committee Member
- Dick Doyle, Committee Member
Overview
The Ballston Lake Sewer Committee reviews, monitors, and coordinates all aspects of the Ballston Lake Sewer Project with the Town, on behalf of residents in the district.
Grinder Pump Winterization for Seasonal Homes
Properly installed grinder pumps should be sufficiently below ground to avoid freezing problems. Although rare, particularly when residences are unattended for extended periods of time and the system is not being used, the pump is more prone to freezing especially in extreme cold conditions. The document linked below provides proactive measures that a resident can take to minimize the potential for freezing issues when the system will not be used for extended periods of time. The relevant model is the DH071; the information for this model is highlighted in the document provided by E One.
Seasonal Grinder Pump Winterization Information (PDF)
Ballston Lake Sewer Project
The ballstonsewers.org website is no longer available. All pertinent information has been moved to this page.
An overview of the project is included in the Connection Manual (PDF) (also linked in the Documents & Information section below). Also included is information on hiring a contractor and designing the connection, the decommissioning and connection application process, installation, grinder pump information, a chart of the work sequence, a resident checklist, sewer do's and don'ts, frequently asked questions, and more.
May 15, 2023 Update:
The Ballston Lake Sewer Project has reached substantial completion, with the contractors continuing to work on property restoration. The Town mailed a letter to sewer district residents on May 15, 2023, detailing the next steps in the process. Click below to view the letter.
May 2023 - Ballston Lake Sewer District Letter to Residents (PDF)
Contact information for questions:
- For general questions on connection requirements, contact the Saratoga County Sewer District at 518-664-7396.
- For questions on septic abandonment and sewer use law, contact the Town of Ballston Building Department at 518-490-2715.
Forms and Information
Forms
- Application for Review of Assigned EDU (PDF)
- Application for Deferral of Sewer Connection (PDF)
- Town of Ballston Permit: Waste Water System (Septic) Permit Application for New, Replacement or Decommission (PDF)
- Saratoga County Permit: Saratoga County Sewer District Residential Sewer Lateral Permit Application (PDF)